When clients ask which heating system to choose, our answer is usually that they should decide that last. The system follows the building, not the other way round.
The building before
The workshop was a single-skin brick shell with a steel roof, no insulation anywhere and original roof lights. Modelled heat demand at the start was around 210 kWh per square metre a year, which would have meant a large heat pump, a large radiator in every room and a large bill.
Where the money went
- 180 mm of wood fibre inside the brick, finished in lime render
- 300 mm in the roof, with an airtight membrane taped and tested
- New triple-glazed oak windows in the existing openings
- Insulated slab over the old concrete floor
- Mechanical ventilation with heat recovery
The building after
Measured use across the first full year was 41 kWh per square metre. The heating is a 5 kW heat pump, about a third of the size the original building would have needed, feeding an underfloor loop. There are no radiators.
The envelope work cost more than the heating saving alone would justify in the first decade. What it also bought was quiet, even temperatures, no draughts at ankle height and a building that will still be comfortable when the current equipment is replaced twice over.
That is the argument we make at sketch stage, with figures rather than principles, and it is why the energy model is drawn before the plan is fixed.