How we test a design, which materials we trust and what each stage of the work costs.
(01) Principles
Four tests every design has to pass
Before a drawing leaves the studio it is checked against the same four questions, whether the project is a garden room or a public hall.
01
Does it sit well on the site?
Orientation, slope, access and the neighbours come before the plan. A good building on the wrong part of a plot stays a bad project.
02
Is it comfortable without machines?
Compact form, insulation, airtightness and shading are set first, so equipment can stay small, cheap and simple to maintain.
03
Can it be built for the budget?
Every option carries a cost range from sketch stage. We would rather lose a square metre early than a room during tendering.
04
Will it look after itself?
Materials are chosen for how they age and how they are repaired, with details that keep water away from the things that rot.
(02) Materials
Chosen to age well
We work with a short list of materials we know: lime plaster, timber, pale concrete, oak, dark steel, cork and clay tile. A limited palette costs less, is easier to detail properly and leaves the building quiet enough for the light to do the work.
- Timber structure wherever spans allow
- Lime and clay finishes that breathe
- Reclaimed brick, stone and joinery
- Samples agreed on site before ordering

(03) Fees and timing
Questions clients ask first
If something here is unclear, ask us directly and we will answer with figures for your project.
What does the first conversation cost?
Nothing. We spend an hour at the site or in the studio, look at the constraints and tell you honestly whether the brief and the budget can meet. You receive a short written note afterwards.
How are your fees calculated?
As a fixed fee per stage, quoted before that stage begins. A full private house service is usually between 9% and 12% of construction cost; a feasibility study starts at €2,400.
How long does a house take?
Allow four to six months from first sketch to a submitted application, two to three months for consent, and ten to fourteen months on site. Renovations are less predictable and we say so early.
Can you join a project that has started?
Yes. We often take over after a refused application or an incomplete drawing set. We review what exists, tell you what is usable and quote only for the stages still needed.
Do you work with our own builder?
Gladly. We draw to a standard any competent contractor can price, and we are equally happy to run a tender with three builders so you can compare like with like.
Start with one honest hour
Bring the plot, the building or the brief, and we will tell you what is possible before you spend anything.