Why we draw every detail before tendering

There is a tempting shortcut in building: send the contractor a set of plans, let the details be worked out later, start sooner. Almost every expensive surprise we have seen on site began with that decision.

What a contractor prices

A builder prices what is drawn. Where the drawing stops, the price becomes a guess, and a guess is always protected by a margin. Twenty vague junctions in a drawing set turn into twenty small margins, and then into variations once the work begins.

On a recent clinic conversion the full set ran to sixty-four sheets, including every window reveal, threshold and service route. The contractor priced the job once and held that price through a twenty-two week build. The extra drawing time was three weeks.

Details are design, not paperwork

A building is experienced at the scale of a door handle, a window reveal, the edge of a floor. Those are decided in the details. If they are left to the site, they are decided by whoever is holding the tool that morning, under time pressure.

What this means for the programme

Expect the drawing stage to feel slow and the site to feel calm. We would rather spend an extra month at the table than six months answering questions by telephone while the scaffolding stands idle.

It also makes comparison honest. With a complete set, three builders price the same building, and the differences you see are real differences in their rates, not in what each of them imagined.