Nothing soaks away on this site, so the drainage strategy had to hold water rather than lose it. We set the levels to drain the whole estate to two attenuation basins and sized the storage for a one-in-hundred-year event with a forty per cent climate allowance.
The pavement build-ups were designed around the measured subgrade rather than a standard table, which took 90 millimetres out of the sub-base across the service roads and paid for the basin landscaping.
We produced the levels model, the drainage layout and the permit submission, and attended the site weekly while the ground works were open.