The tenant was known before design started, so we had the racking layout and could put the frame where it helped. Portal spans of 32 metres with 7.5 metre bays cleared the aisles without a single internal column in the picking area.
Foundations were the real question. The site is reclaimed ground, and rather than pile the whole footprint we used a ground improvement grid under the floor slab and pads only at the frame positions.
We designed the frame, the slab and the loading dock structure, and carried out the erection inspections including every holding-down bolt group before the steel arrived.