The authority wanted a crossing with no pier in the water and no painting contract for the next thirty years. We took the deck to a shallow steel box with tapered edge plates, which keeps the structural depth under one metre at midspan and lets the handrail read as a single line from the bank.
The span was fabricated in two pieces, bolted on the quay and craned in during a single night closure. Our engineer was present for the lift and for every bearing set-out, and the as-built survey came back within four millimetres of the design line.
Inspection was designed in from the start: both bearings and the full soffit can be reached from a mobile platform without touching the water, which was a condition of the maintenance agreement.