Canal footbridge, Riverside Quarter

A 48 metre single span in weathering steel, lifted in overnight and open to the public eleven weeks later.

The authority wanted a crossing with no pier in the water and no painting contract for the next thirty years. We took the deck to a shallow steel box with tapered edge plates, which keeps the structural depth under one metre at midspan and lets the handrail read as a single line from the bank.

The span was fabricated in two pieces, bolted on the quay and craned in during a single night closure. Our engineer was present for the lift and for every bearing set-out, and the as-built survey came back within four millimetres of the design line.

Inspection was designed in from the start: both bearings and the full soffit can be reached from a mobile platform without touching the water, which was a condition of the maintenance agreement.

Type

Footbridge

Location

Riverside Quarter

Year

2024

Client

Meridian Municipal Works

Scope

Design, tender drawings and site supervision, 48 m single span

Work done

  • Concept and detailed design
  • Maintenance-free finish
  • Public infrastructure
  • Site supervision
  • Steel deck analysis