School hall roof, Meadowside campus

A 27 metre clear span over a sports hall, erected in the summer holiday between two school terms.

The old hall had a timber roof at the end of its life and columns the sports authority would not accept inside the playing area. We replaced it with tapered steel trusses at 6 metre centres, bearing on the existing masonry through new concrete padstones.

Because the walls stayed, we tested them first. Core samples and a capacity check showed they could take the new reactions with local strengthening at four positions only, which kept the budget inside the grant.

The whole roof went up in nine weeks with the building empty. The hall reopened on the first day of the autumn term.

Type

School building

Location

Meadowside campus

Year

2022

Client

Meridian Municipal Works

Scope

Long-span steel roof and masonry strengthening, 27 m clear span

Work done

  • Existing structure survey
  • Programme-critical works
  • Public client reporting
  • Steel roof design