The old hall had a timber roof at the end of its life and columns the sports authority would not accept inside the playing area. We replaced it with tapered steel trusses at 6 metre centres, bearing on the existing masonry through new concrete padstones.
Because the walls stayed, we tested them first. Core samples and a capacity check showed they could take the new reactions with local strengthening at four positions only, which kept the budget inside the grant.
The whole roof went up in nine weeks with the building empty. The hall reopened on the first day of the autumn term.