The site is narrow and the basement had to hold forty-one cars, so the grid was driven from the bottom up. Post-tensioned flat slabs let us keep a 230 millimetre structural depth over spans of 7.8 metres, which bought the architect an extra storey inside the same height limit.
The ground floor transfers two lines of upper columns onto the basement grid. We modelled the transfer zone separately and detailed the reinforcement at full scale, because that is where frames go wrong.
We inspected every slab before the stressing crew arrived and signed off each pour. The frame was topped out two weeks ahead of the contractor’s programme.