Drainage decides your site levels

Drainage tends to be treated as a late package: the building is designed, the levels are fixed, and then someone asks where the water goes. On a flat site with heavy ground, that order of work can cost a storey of basement or a lorry convoy of imported fill.

Water leaves a site in one of three ways

It soaks away, it goes to a watercourse, or it goes into a sewer at a rate the authority permits. Which one applies is a question for week one, because each has a different consequence for levels. Infiltration needs permeable ground and a water table well below the base of the system. A discharge to a watercourse needs an outfall level you cannot invent. A sewer connection almost always comes with a restricted flow rate, and restriction means storage.

Storage is a volume, and volume needs space

Once a flow limit is set, the rest is arithmetic: the difference between what falls on the site and what you are allowed to release has to sit somewhere until the storm passes. On a recent 4.2 hectare business park, attenuation for a one-in-hundred-year event with a forty per cent climate allowance came to just over 1,100 cubic metres. Held in two shallow basins it cost very little. Held in tanks under the car park it would have cost six figures.

Three decisions worth making early

  • Where the lowest point of the site will be, and whether you own it
  • Whether the storage can be open, landscaped and shallow rather than buried
  • What the finished floor level needs to be above the flood and surcharge levels

Why we ask for a topographical survey first

A measured survey with levels, existing drainage, cover and invert levels and tree positions costs a fraction of a redesign. With it we can set the levels, size the system and give the architect a floor level that will survive the permit process. Without it, every number is provisional, and provisional numbers have a way of becoming expensive.