{"id":282,"date":"2026-11-06T10:31:36","date_gmt":"2026-11-06T09:31:36","guid":{"rendered":"http:\/\/localhost:8801\/plinth\/insulation-before-boilers-a-renovation-in-numbers\/"},"modified":"2026-11-06T10:31:36","modified_gmt":"2026-11-06T09:31:36","slug":"insulation-before-boilers-a-renovation-in-numbers","status":"publish","type":"post","link":"https:\/\/demo.zetan.eu\/plinth\/insulation-before-boilers-a-renovation-in-numbers\/","title":{"rendered":"Insulation before boilers: a renovation in numbers"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">When clients ask which heating system to choose, our answer is usually that they should decide that last. The system follows the building, not the other way round.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">The building before<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The workshop was a single-skin brick shell with a steel roof, no insulation anywhere and original roof lights. Modelled heat demand at the start was around 210 kWh per square metre a year, which would have meant a large heat pump, a large radiator in every room and a large bill.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Where the money went<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>180 mm of wood fibre inside the brick, finished in lime render<\/li>\n\n\n<li>300 mm in the roof, with an airtight membrane taped and tested<\/li>\n\n\n<li>New triple-glazed oak windows in the existing openings<\/li>\n\n\n<li>Insulated slab over the old concrete floor<\/li>\n\n\n<li>Mechanical ventilation with heat recovery<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">The building after<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Measured use across the first full year was 41 kWh per square metre. The heating is a 5 kW heat pump, about a third of the size the original building would have needed, feeding an underfloor loop. There are no radiators.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The envelope work cost more than the heating saving alone would justify in the first decade. What it also bought was quiet, even temperatures, no draughts at ankle height and a building that will still be comfortable when the current equipment is replaced twice over.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">That is the argument we make at sketch stage, with figures rather than principles, and it is why the energy model is drawn before the plan is fixed.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A workshop conversion where the whole energy budget went into the envelope, and the heating system became almost an afterthought.<\/p>\n","protected":false},"author":1,"featured_media":16,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-282","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/demo.zetan.eu\/plinth\/wp-json\/wp\/v2\/posts\/282","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/demo.zetan.eu\/plinth\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/demo.zetan.eu\/plinth\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/demo.zetan.eu\/plinth\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/demo.zetan.eu\/plinth\/wp-json\/wp\/v2\/comments?post=282"}],"version-history":[{"count":0,"href":"https:\/\/demo.zetan.eu\/plinth\/wp-json\/wp\/v2\/posts\/282\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/demo.zetan.eu\/plinth\/wp-json\/wp\/v2\/media\/16"}],"wp:attachment":[{"href":"https:\/\/demo.zetan.eu\/plinth\/wp-json\/wp\/v2\/media?parent=282"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/demo.zetan.eu\/plinth\/wp-json\/wp\/v2\/categories?post=282"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/demo.zetan.eu\/plinth\/wp-json\/wp\/v2\/tags?post=282"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}